Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 

Integrating Line-Card Chassis into a New TX Matrix Plus Routing Matrix with 3D SIBs

 

To integrate a line-card chassis (LCC) into a new TX Matrix Plus Routing Matrix with 3D SIBs:

  1. Install the switch-fabric chassis (SFC).

    See Overview of Installing a TX Matrix Plus Router .

  2. Upgrade the SFC to 64-bit Junos OS Release 13.2 or later.

    See Upgrading the Junos OS on the TX Matrix Plus Router and Line-Card Chassis.

  3. Upgrade each LCC to 64-bit Junos OS Release 13.2 or later.

    See Upgrading the Junos OS on the TX Matrix Plus Router and Line-Card Chassis.

  4. Upgrade all components in the LCCs except the SIBs.

    See the following documentation:

  5. Upgrade the SIBs in one operational LCC and integrate the LCC into the routing matrix.Note

    The LCC must be LCC0.

    See the following documentation:

  6. Upgrade the SIBs in the remaining LCCs. Note

    The remaining LCCs must be offline during the SIB upgrade and integration into the routing matrix.

    See Upgrading the SIBs in an Offline Line-Card Chassis.

  7. Integrating the remaining LCCs.

    See Overview of Integrating an Offline Line-Card Chassis into a Routing Matrix.

  8. Power on the remaining LCCs.

    See Powering On the Line-Card Chassis.

  9. Verify that the TX Matrix Plus routing matrix is operating properly.

    See Overview of Verifying the State of a Routing Matrix .

  10. Register your upgrade.

    See Registering Your Switch-Fabric Chassis and Line-Card Chassis Upgrade.