Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

Navigation
Guide That Contains This Content
[+] Expand All
[-] Collapse All

    Installing a JCS1200 Power Module

    Figure 1 shows how to remove and install a power module.

    Figure 1: Removing and Installing a JCS1200 Power Module

    Removing and Installing
a JCS1200 Power Module

    To install a power module (see Figure 1):

    1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to one of the ESD points on the chassis.
    2. Remove the power module filler, if one is installed.
    3. Make sure that the handle on the power module is in the open position.
    4. Orient the new power module to the selected power module bay:
      • For the upper power module bays, the rear connector on the power module must be facing down.
      • For the lower power module bays, the rear connector on the power module must be facing up.

    Published: 2013-01-30