Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

Navigation
Guide That Contains This Content
[+] Expand All
[-] Collapse All

    Mapping Input Power from Three-Phase Wye AC Power Distribution Modules to AC Power Supply Modules on the MX2010 Router

    You connect AC power to the router with three-phase wye AC PDMs by connecting two AC power cords in such a way that input #1 cord is capable of supplying power to six PSMs and input #2 is capable of supplying power to three PSMs (this is to match the internals of the PDM where one feed gets mapped to six PSMs and the other gets mapped to three PSMs), (see Figure 1). Table 1 shows the three-phase wye AC PDM input mapping to AC PDM0 and PDM1.

    Figure 1: Mapping AC Three-Phase Wye Power Distribution Modules Input to AC Power Supply Modules

    Mapping AC Three-Phase
Wye Power Distribution Modules Input to AC Power Supply Modules

    Table 1: Input AC Power Mapping for Three-Phase Wye PDM0 and PDM1

    INP0/0–LEFT (PDM0-input #2)

    INP0/0–RIGHT (PDM0-input #1)

    INP1/1–LEFT (PDM1-input #1)

    INP1/1–RIGHT (PDM1-input #2)

    PSM0

    PSM3

    PSM0

    PSM6

    PSM1

    PSM4

    PSM1

    PSM7

    PSM2

    PSM5

    PSM2

    PSM8

    PSM6

    PSM3

    PSM7

    PSM4

    PSM8

    PSM5

    Published: 2013-06-05