Installing Components in a Replacement JCS 1200 Chassis
To install a components in a replacement JCS 1200 chassis:
- Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and connect the strap to one of the ESD points on the chassis.
- Install the upper and lower power boxes into the JCS 1200 chassis (see Installing a JCS 1200 Power Box).
- Install the fan shuttle into the JCS 1200 chassis (see Installing a JCS 1200 Fan Shuttle).
- Push the following components fully into the front
of the JCS 1200 platform to reengage the midplane:
- Routing Engines: Slide each Routing Engine or filler into the bay; then push the two release handles to the closed position (see Installing a JCS 1200 Routing Engine).
- Media trays: Slide each media tray or filler into the JCS 1200 platform; then push the release handle to the closed position (see Installing a JCS 1200 Media Tray).
- Switch modules: Slide each switch module or filler into the JCS 1200 platform; then push the release handle to the closed position (see Installing a JCS 1200 Switch Module or Module Filler).
- Management modules: Slide each management module or filler into the JCS 1200 platform; then push the release handle to the closed position (see Installing a JCS 1200 Management Module or Module Filler).
- Slide each power module or filler into the bay; then push the release handle to the closed position (see Installing a JCS 1200 Power Module).
- Reconnect the power to the JCS 1200 platform (see Connecting the JCS 1200 AC Platform to AC Power or Connecting the JCS 1200 DC Platform to DC Power).
- Restart any Routing Engines that were powered off in the JCS 1200 platform (see Powering On a JCS 1200 Routing Engine).