Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 

Installing the M7i Cable Management System

 

The cable management system organizes and supports the PIC cables to prevent damage.

To install the cable management system (see Figure 1):

  1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and connect the strap to one of the ESD points on the chassis. Verify that the router is attached to a proper earth ground.
  2. Use a number 2 Phillips screwdriver to loosen the screws that secure the mounting brackets to the chassis, and remove the mounting brackets.
  3. Locate the cable management racks and appropriate screws in the accessory box.
  4. Slide the cable management rack into the slots at the front of the chassis.
  5. Use a number 2 Phillips screwdriver to tighten the screws that secure the cable management system to the chassis.
  6. Reinstall the mounting brackets.
Figure 1: Installing the Cable Management System
Installing the Cable
Management System