Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 

Installing an AC Power Supply in the SRX1400 Services Gateway

 

To install an AC power supply:

  1. Attach an ESD grounding strap to your bare wrist and connect the strap to one of the ESD points on the chassis.

    For more information about ESD, see Preventing Electrostatic Discharge Damage to the SRX1400 Services Gateway.

  2. Orient the power supply so that the locking lever is on the left, as shown in Figure 1.
    Figure 1: Installing an AC Power Supply in the SRX1400 Services Gateway
    Installing an AC
Power Supply in the SRX1400 Services Gateway
  3. Using both hands, slide the power supply straight into the chassis until the power supply is fully seated in the chassis slot. The power supply faceplate should be flush with any adjacent power supply faceplate or blank installed in the power supply slot.
  4. Proceed with connecting the power supply to AC power. See Connecting the SRX1400 Services Gateway to an AC Power Supply for information on connecting the power supply to AC power.