Site Preparation Checklist for an XRE200
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for an XRE200 External Routing Engine installation.
Table 1: Site Preparation Checklist
Item or Task | For More Information | Performed By | Date |
---|---|---|---|
Environment | |||
Verify that environmental factors such as temperature and humidity do not exceed external Routing Engine tolerances. | Environmental Requirements and Specifications for EX Series Switches | ||
Power | |||
Measure distance between external power sources and external Routing Engine installation site. | |||
Locate sites for connection of system grounding. | |||
Calculate the power consumption and requirements. | AC Power Specifications for XRE200 External Routing Engines DC Power Specifications for an XRE200 External Routing Engine | ||
Hardware Configuration | |||
Choose the number and types of external Routing Engines you want to install. | |||
Rack or Cabinet | |||
Verify that your rack or cabinet meets the minimum requirements for the installation of the external Routing Engine. | |||
Plan rack or cabinet location, including required space clearances. | |||
Secure the rack or cabinet to the floor and building structure. | |||
Cables | |||
Acquire cables and connectors:
| Cables Connecting the XRE200 External Routing Engine to XRE200 External Routing Engines and EX8200 SwitchesCables Connecting the XRE200 External Routing Engine to XRE200 External Routing Engines and EX8200 Switches | ||
Plan the cable routing and management. |