Site Preparation Checklist for SSR120
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for SSR120 installation.
Table 1: Site Preparation Checklist
Item or Task | For More Information | Performed by | Date |
---|---|---|---|
Environment | |||
Verify that environmental factors such as temperature and humidity do not exceed appliance tolerances. | |||
Power | |||
Measure the distance between external power sources and the installation site. | |||
Locate sites for connection of system grounding. | |||
Calculate the power consumption and requirements. | |||
Rack | |||
Verify that your rack or cabinet meets the minimum requirements for the installation of the appliance. | |||
Plan rack location, including required space clearances. | |||
Secure the rack or cabinet to the floor and building structure. | |||
Desk | |||
Verify that the desk meets the minimum requirements for the installation of the appliance. | Requirements for Mounting an SSR120 Appliance on a Desktop or Other Level Surface | ||
Verify that there is appropriate clearance in your selected location. | |||
Cables | |||
Acquire cables and connectors:
| |||
Plan the cable routing and management. |