Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 

General Site Guidelines for Installing the SRX110 Services Gateway

 

The following precautions help you plan an acceptable operating environment for your services gateway and avoid environmentally caused equipment failures:

  • The SRX110 Services Gateway requires unrestricted circulation of air to maintain an optimal operating temperature. Allow sufficient clearance between the front and back of the chassis and adjacent equipment. Ensure that there is adequate circulation in the installation location.

  • Follow the electrostatic discharge (ESD) procedures to avoid damaging the equipment. Static discharge can cause components to fail completely or intermittently over time.

Note

Install the device only in restricted areas, such as dedicated equipment rooms and equipment closets, in accordance with Articles 110–16, 110–17, and 110–18 of the National Electrical Code, ANSI/NFPA 70.