Site Preparation Checklist for an EX9253 Switch

 

The checklist in Table 1 summarizes the tasks you need to perform to prepare a site for installing an EX9253 switch.

Table 1: Site Preparation Checklist

Item or Task

For More Information

Performed by

Date

Environment

Verify that environmental factors such as temperature and humidity do not exceed switch tolerances.

Environmental Requirements and Specifications for an EX9253 Switch

  
Power

Measure distance between external power sources and switch installation site.

   

Calculate the power consumption and requirements.

EX9253 Power System

Calculating the Fiber-Optic Cable Power Budget for EX Series Devices

Calculating the Fiber-Optic Cable Power Margin for EX Series Devices

  
Rack or Cabinet

Select the type of rack or cabinet and verify that it meets the minimum requirements for the installation of the switch.

Rack and Cabinet Requirements for EX9253 Switches

  

Plan rack or cabinet location, ensuring the required space clearances.

Clearance Requirements for Airflow and Hardware Maintenance for an EX9253 Switch

  

Secure the rack or cabinet to the floor and building structure.

Rack and Cabinet Requirements for EX9253 Switches

  
Cables

Plan the cable routing and management.

Acquire cables and connectors:

  • Determine the number of cables needed based on your planned configuration.

  • Ensure that the distance between hardware components to be connected allows for cable lengths to be within the specified maximum limits.