Navigation
Table of Contents
Guide That Contains This Content
[+] Expand All
[-] Collapse All
M Series Search
Related Documentation
- M Series
- Installing the M40e Chassis into the Rack
- Installing the M40e Router Using a Mechanical Lift
- Removing Components from the Chassis Before Installing the M40e Router Without a Lift
- Installation Instructions Power Warning for M Series, MX Series, and T Series Routers
- Rack-Mounting Requirements and Warnings for M Series, MX Series, and T Series Routers
- Ramp Warning for M Series, MX Series, and T Series Routers
M40e Chassis Lifting Guidelines
The weight of a fully configured chassis is about 360 lb (164 kg). Observe these guidelines for lifting and moving the router:
- Before moving the router, read the guidelines inM40e Site Preparation Checklist to verify that the intended site meets the specified power, environmental, and clearance requirements.
- Do not attempt to lift a fully configured router by yourself. Using a mechanical lift to maneuver the router into a rack is recommended. If a lift cannot be used, a minimum of three people must lift the router, and you must remove components from the chassis before lifting.
- Before lifting or moving the router, disconnect all external cables.
- As when lifting any heavy object, lift most of the weight with your legs rather than your back. Keep your knees bent and your back relatively straight and avoid twisting your body as you lift. Balance the load evenly and be sure that your footing is solid.
Related Documentation
- M Series
- Installing the M40e Chassis into the Rack
- Installing the M40e Router Using a Mechanical Lift
- Removing Components from the Chassis Before Installing the M40e Router Without a Lift
- Installation Instructions Power Warning for M Series, MX Series, and T Series Routers
- Rack-Mounting Requirements and Warnings for M Series, MX Series, and T Series Routers
- Ramp Warning for M Series, MX Series, and T Series Routers