SRX320 Site Preparation Checklist
Table 1 provides a checklist of tasks you need to perform when preparing a site for installing the SRX320 Services Gateway.
Table 1: Site Preparation Checklist for SRX320 Services Gateway Installation
Item or Task | Additional Information |
---|---|
Environment | |
Verify that environmental factors such as temperature and humidity do not exceed device tolerances. | |
Power | |
| SRX320 Services Gateway Electrical Wiring Guidelines SRX320 Services Gateway Power Specifications and Requirements |
Rack Requirements | |
Verify that your rack meets the minimum requirements. | |
Rack Installation | |
| |
Cabinet Requirements | |
| |
Wall Installation | |
| |
Desktop Installation | |
| |
Cables | |
|