MX960 Site Preparation Checklist
The checklist in Table 1 summarizes the tasks you must perform when preparing a site for router installation.
Table 1: MX960 Site Preparation Checklist
Item or Task | For More Information | Performed By | Date |
---|---|---|---|
Verify that environmental factors such as temperature and humidity do not exceed router tolerances. | |||
Select the type of rack or cabinet. | MX960 Cabinet Size and Clearance Requirements, | ||
Plan rack or cabinet location, including required space clearances. | MX960 Cabinet Size and Clearance Requirements, | ||
If a rack is used, secure rack to floor and building structure. | |||
Acquire cables and connectors. | |||
Locate sites for connection of system grounding. | |||
Measure distance between external power sources and router installation site. | |||
Calculate the optical power budget and optical power margin. | Calculating Power Budget and Power Margin for Fiber-Optic Cables |