    The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for platform installation.

    Table 1: Site Preparation Checklist

    Item or Task

    For More Information

    Performed By

    Date

    Environment

    Verify that environmental factors such as temperature and humidity do not exceed platform tolerances.

    JCS1200 Platform Environmental Specifications

      
    Power

    Locate sites for connection of system grounding.

    JCS1200 DC Power Grounding Requirements and Warning

      

    Calculate the power consumption and requirements.

      
    Rack

    Verify that your rack meets the minimum requirements for the installation of the platform.

      

    Plan rack location, including required space clearances.

    JCS1200 Clearance Requirements for Airflow and Hardware Maintenance

      

    If a rack is used, secure rack to floor and building structure.

    JCS1200 Connection to Building Structure

      