Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 

Installation Overview for the SRX550 Services Gateway

 

After you have prepared the site for installation and unpacked the SRX550 Services Gateway, you are ready to install the device. It is important to proceed through the installation process in the following order:

  1. Review the safety guidelines explained in General Electrical Safety Guidelines and Warnings.
  2. Prepare the services gateway for installation as described in Preparing the SRX550 Services Gateway for Rack-Mount Installation.
  3. Install the services gateway as described in Installing the SRX550 Services Gateway in a Rack.
  4. Connect cables to external devices.
  5. Connect the grounding cable as described in Grounding the SRX550 Services Gateway.
  6. Power on the services gateway as described in Powering On the SRX550 Services Gateway.