Index

Symbols  A  B  C  D  E  F  G  H  I  J  L  M  N  O  P  Q  R  S  T  U  V  W  X

 

Symbols

#, comments in configuration statements
( ), in syntax descriptions
< >, in syntax descriptions
[ ], in configuration statements
{ }, in configuration statements
| (pipe), in syntax descriptions
 

A

AC input    
line frequency
voltage
AC power    
cord specifications
cord types
AC power cord    
connecting on services gateway
disconnecting on services gateway
AC power safety guidelines
AC power supply    
connecting to services gateway
installing on services gateway
removing from services gateway
tools required for connecting
AC system current rating
accident procedures, electrical
acoustic noise compliance statement
agency approvals
agency label, chassis
air filter    
hot-swappable
installing on services gateway
removing from services gateway
airflow    
clearance requirements
requirements
altitude, acceptable range
autoinstallation, overview
automatic configuration
 

B

back panel
backplane    12
basic connectivity    
displaying configurations for services gateway
battery-handling warning
boot devices, dual-root partitioning
braces, in configuration statements
brackets    
angle, in syntax descriptions
square, in configuration statements
built-in Ethernet ports, connecting
 

C

cabinet requirements    
airflow
clearance
size
cabinet size requirements
cables, connecting Ethernet
chassis    
description
physical specifications
class 1 laser warning
class 1 LED warning
clearance    
requirements for airflow
requirements for hardware maintenance
clearance for cabinet
CLI    
connecting at user end for services gateway
connecting management device
connecting modem
listing component details
locally connecting services gateway
remotely connecting services gateway
command-line interface     See CLI    
comments, in configuration statements
compliance statement, acoustic noise
compliance statements, EMC requirements    
Canada
European Community
Japan
United States
component details, listing with the CLI
components, packing for shipment
configuration    
basic settings
configuration, required equipment for
connecting    
AC power cord
CLI at user end
services gateway to building structure
tools required for AC power supply
tools required for DC power supply
tools required for services gateway
connectivity    
overview, services gateway
settings, displaying
console cable connector
console port    
connecting modem
connecting services gateway
control port
conventions    
notice icons
text and syntax
cooling system
cords, AC power supply
curly braces, in configuration statements
customer support, contacting
 

D

damage, preventing ESD
DC input, voltage
DC power supply    
connecting to services gateway
installing on services gateway
removing from services gateway
tools required for connecting
DC power supply cable, removing from services gateway
DC system current rating
depth, of chassis
device identification
disconnecting AC power cord
dual-root partitioning    
boot devices
overview
 

E

earthquakes, tested toleration for shock
electrical    
accident procedures
safety guidelines and warnings    1
AC power
specifications    12
wiring
electrostatic discharge    12
EMC    
electromagnetic compatibility
EMC requirements    
Canada
European Community
Japan
United States
encrypted access    
through HTTPS
through SSH
through SSL
environmental requirements, lithium battery
environmental specifications
ESD     See electrostatic discharge    
Ethernet cable, connecting services gateway to management device with
Ethernet ports, built-in
 

F

factory default configuration    
resetting services gateway to
fan controller
fan tray    
hot-swappable
installing on services gateway
removing from services gateway
features, services gateway
flange holes, spacing of
font conventions
front panel
front-mounting services gateway
 

G

ge-0/0/0, management port
ge-0/0/1, control port
GPIMs    
backplane
double-high, double-wide
double-high, single-wide
hot-swappable
network interface card
graceful shutdown
grounding    
lug specification
points
services gateway
specifications
grounding cable    
amperage of
specifications
guidelines, electrical safety
 

H

height, of chassis
hot-swappable    
GPIMs
HTTPS (Hypertext Transfer Protocol over SSL)    
recommended for secure access
humidity (relative), acceptable
 

I

immediate shutdown
immunity standards
initial configuration, using setup wizard
installation    
checklist
DC power, connecting
guidelines
overview
preparing site for
site guidelines
installing    
AC power supply
air filter
DC power supply
fan tray
services gateway
services gateway in a rack
interface cables, organizing on services gateway
 

J

jewelry removal warning
JTAC    12
Juniper Technical Assistance Center     See JTAC    
Junos OS
 

L

labels    
agency
chassis serial number
GPIM
laser beam warning
laser safety guidelines
LEDs    
class 1 warning
front panel
POWER
safety warnings
SRE
STATUS    12
troubleshooting with
levels of safety warnings
licenses, for services gateway
lightning activity warning
lithium battery, compliance specifications
 

M

management access
management port
modem    
adapter
configuring at services gateway end
configuring at user end
connecting at services gateway end
connecting to console port on services gateway
mounting brackets    
holes
spacing
 

N

NEBS standards
network cables, organizing on services gateway
network interface card, GPIM
notice icons
 

O

OFFLINE button
operating temperature warning
overview, installation of services gateway
 

P

packing services gateway    
components for shipment
required tools and parts
parentheses, in syntax descriptions
partitioning, services gateway
parts    
required for packing
verifying received    12
Physical Interface Module     See GPIMs    
physical specifications, chassis
plug types    12
PoE    
overview
ports
specifications
port settings    
configuring the modem    12
for connection
services gateway
power    
requirements
safety guidelines, AC
specifications    12
POWER LED
Power over Ethernet     See PoE    
power supply    1
hot-swappable
installing AC
installing DC
power-up reset
powering off services gateway
powering on services gateway
preparing for rack-mount installation
preparing site for installation
preventing ESD damage
product disposal warning
 

Q

qualified personnel warning
 

R

rack    
installation preparation, services gateway
installation, services gateway
rack requirements    
mounting
size
strength
radiation from open port apertures warning
radio frequency interference     See RFI    
relative humidity, acceptable
removing    
AC power supply
air filter
fan tray
removing DC power supply
removing DC power supply cable
repair policies
RESET CONFIG button    12
resetting services gateway    1
power-up
RESET CONFIG button
restricted access area warning
return materials authorization     See RMA    
return procedure
RFI    
radio frequency interference
RMA    
return materials authorization
 

S

safety guidelines, laser
safety requirements    
guidelines
warnings
safety warning levels, definition
secure access    
CLI requirements
HTTPS recommended
overview
Telnet versus SSH
Web requirements
Secure Sockets Layer     See SSL    
seismic (earthquake), tested level
serial number label, chassis
serial number label, GPIM
services gateway    
back panel
connecting AC power cord
connecting to the setup wizard
description
disconnecting AC power cord
establishing secure Web access
front panel
HTTPS Web access
installing AC power supply
installing DC power supply
packing for shipment
removing AC power supply
removing DC power supply
removing DC power supply cable
returning
SSH access
SSL access
supported GPIMs
tools required for powering on
setup wizard, connecting services gateway
shipment    
packing components
packing services gateway
show chassis hardware command
shutting down services gateway    1
graceful
immediate
signaling limitations
site, environmental specifications
specifications, environmental
SSH, connecting to services gateway
SSL (Secure Sockets Layer)    
management access
standards compliance
STATUS LED    12
support, requesting from JTAC    12
surge protector    12
syntax conventions
system time
 

T

telnet, connecting to services gateway
temperature, acceptable range
thermal output
time zone
tolerances
tools required for    
connecting AC power supply
connecting DC power supply
connecting services gateway
grounding
installing
packing
powering off
powering on
replacing hardware components
unpacking
 

U

unpacking    
required tools and parts
services gateway    12
 

V

verifying parts received with services gateway
 

W

warnings    
battery-handling
class 1 laser
class 1 LED
electrical safety guidelines
general
jewelry removal
laser beam
lightning activity
operating temperature
product disposal
rack-mount requirements
radiation from open apertures
weight, of chassis
width, of chassis
wrist strap, for grounding    12
 

X

XPIMs    
double-high, double-wide
double-high, single-wide
single-high, single-wide