Powering Off the SRX5600 Services Gateway

Note: After powering off a power supply, wait at least 60 seconds before turning it back on.

To power off the services gateway:

  1. On the external management device connected to the Routing Engine, issue the request system halt operational mode command. The command shuts down the Routing Engine cleanly, so its state information is preserved.

    user@host> request system halt
  2. Wait until a message appears on the console confirming that the operating system has halted. For more information about the command, see the Junos OS System Basics and Services Command Reference.
  3. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to one of the ESD points on the chassis.
  4. On an AC-powered services gateway, switch the AC switch on each power supply to the off position (O). On a DC-powered services gateway, switch the circuit breaker on each power supply to the off position (OFF).

Related Documentation