Site Preparation Checklist for the SRX550 Services Gateway

The checklist in Table 11 summarizes the tasks you need to perform when preparing a site for installing the SRX550 Services Gateway.

Table 11: Site Preparation Checklist for SRX550 Services Gateway Installation

Item or Task

Additional Information

Performed By

Date

Notes

Power

Measure distance between external power sources and device installation site.

SRX550 Services Gateway Electrical Wiring Guidelines

   

Locate sites for connection of system grounding.

Grounding the SRX550 Services Gateway

   

Calculate the power consumption and requirements.

SRX550 Services Gateway AC Power Supply Electrical Specifications and SRX550 Services Gateway DC Power Supply Electrical Specifications

   

Environment

Verify that environmental factors such as temperature and humidity do not exceed device tolerances.

SRX550 Services Gateway Environmental Specifications

   

Rack Installation

Verify that your rack meets the minimum requirements.

SRX550 Services Gateway Rack Size and Strength Requirements

   

Plan rack location, including required space clearances.

SRX550 Services Gateway Spacing of Mounting Bracket and Flange Holes

   

Secure the rack to the floor and building structure.

Connecting the SRX550 Services Gateway to the Building Structure

   

Cabinet Installation

Verify that your cabinet meets the minimum requirements.

SRX550 Services Gateway Cabinet Size and Clearance Requirements

   

Plan the cabinet location, including required space clearances.

SRX550 Services Gateway Cabinet Airflow Requirements

   

Cables

Acquire cables and connectors.

Interface Cabling and Wiring Specifications for the SRX550 Services Gateway

   

Review the maximum distance allowed for each cable. Choose the length of cable based on the distance between the hardware components being connected.

    

Plan the cable routing and management.

    