Installing an I/O Card with Copper Media Interfaces in the SRX3600 Services Gateway

To install an IOC that supports copper media interfaces:

  1. Attach an ESD grounding strap to your bare wrist and connect the strap to one of the ESD points on the chassis. For more information about ESD, see Preventing Electrostatic Discharge Damage to the SRX3600 Services Gateway.
  2. If you have not already done so, power off the services gateway by pressing the Power button on the front panel of the Switch Fabric Board (SFB) for three to five seconds.

    The PWR LED blinks to show you that the services gateway is shutting down. Wait for the services gateway to shut down before proceeding.

  3. Place the IOC on an antistatic mat or remove it from its electrostatic bag.
  4. Identify the slot on the services gateway where it will be installed. You can only install IOCs in front-panel slots.
  5. Orient the IOC so that the faceplate faces you. Slide the IOC all the way into the card cage until you feel resistance.
  6. Tighten the screws on either side of the card.
  7. If you are installing additional IOCs at this time, repeat steps 3 through 6, then continue with the following steps to connect the appropriate cables.
  8. Insert the appropriate cables into the cable connector ports on each IOC. Secure the cables so that they are not supporting their own weight. Place excess cable out of the way in a neatly coiled loop. Placing fasteners on a loop helps to maintain its shape.

Figure 33: Installing an IOC with Copper Interfaces

Installing an IOC with Copper Interfaces

Warning: Never lift the services gateway using the handles on the front panels of the IOCs or other CFM cards. The handles might come off, causing the chassis to drop and inflicting possible grave injury.

Related Documentation