The checklist in Table 22 summarizes the tasks you need to perform when preparing a site for SRX3400 Services Gateway installation.
Table 22: Site Preparation Checklist
Item or Task |
For More Information ... |
Performed By |
Date |
---|---|---|---|
Verify that environmental factors such as temperature and humidity do not exceed Services Gateway tolerances. |
|||
Select the type of rack or cabinet. |
SRX3400 Services Gateway Cabinet Size and Clearance Requirements and SRX3400 Services Gateway Rack Size and Strength Requirements |
||
Plan rack or cabinet location, including required space clearances. |
|||
If a rack is used, secure rack to floor and building structure. |
Connecting the SRX3400 Services Gateway to the Building Structure |
||
Acquire cables and connectors. |
|||
Locate sites for connection of system grounding. |
|||
Measure distance between external power sources and Services Gateway installation site. |
|||
Calculate the optical power budget and optical power margin. |
Calculating the Power Budget for Fiber-Optic Cable for the SRX3400 Services Gateway and Calculating the Power Margin for Fiber-Optic Cable for the SRX3400 Services Gateway |