Installation Overview for the SRX240 Services Gateway
After you have prepared your installation site, you are ready to unpack and install the services gateway. It is important to proceed through the installation process as shown in Table 19.
Table 19: Installation Process Sequence for the SRX240 Services Gateway
Steps | Process | For More Information |
---|---|---|
1 | Review the safety guidelines. | SRX240 Services Gateway Safety Requirements, Warnings, and Guidelines |
2 | Verify that you have prepared your site for the installation of the services gateway using the checklist. | |
3 | Unpack the services gateway and verify that the parts are received. | |
4 | Prepare the services gateway for installation. | |
5 | Install the services gateway. | |
6 | Connect the power supply | Connecting the SRX240 Services Gateway to an AC Power Source (For SRX240 Services Gateway with AC power supply models) |
Connecting the SRX240 Services Gateway to a DC Power Source (For SRX240 Services Gateway with DC power supply models) | ||
7 | Connect cables to external devices. | Connecting and Organizing Interface Cables to the SRX240 Services Gateway |
8 | Connect the grounding cable. | |
9 | Power on the services gateway. |
Related Documentation
- SRX240 Services Gateway Safety Requirements, Warnings, and Guidelines
- General Site Guidelines for Installing the SRX240 Services Gateway
- Unpacking the SRX240 Services Gateway
- Preparing the SRX240 Services Gateway for Installation
- Connecting and Organizing Interface Cables to the SRX240 Services Gateway
- Grounding the SRX240 Services Gateway
- Powering On and Powering Off the SRX240 Services Gateway