Site Preparation Checklist for the SRX240 Services Gateway

The checklist in Table 16 summarizes the tasks you need to perform when preparing a site for installing the SRX240 Services Gateway.

Table 16: Site Preparation Checklist for Services Gateway Installation

Item or Task

Additional Information

Date and Notes

Environment

Verify that environmental factors such as temperature and humidity do not exceed device tolerances.

SRX240 Services Gateway Chassis

 
Power

Measure distance between external power sources and device installation site.

SRX240 Services Gateway Electrical and Power Requirements

 

Locate sites for connection of system grounding.

SRX240 Services Gateway Grounding Specifications

 

Gather the AC power requirements.

SRX240 Services Gateway AC Power Specifications and Requirements

 

Gather the DC power requirements.

SRX240 Services Gateway DC Power Specifications and Requirements

 
Rack Installation
  • Verify that your rack meets the minimum requirements.
  • Plan the rack location, including required space clearances.
  • Secure the rack to the floor and the building structure.

SRX240 Services Gateway Rack Requirements

 
Cables  
  • Acquire cables and connectors.
  • Choose the cable length as required by the distance between the hardware components being connected.
  • Plan the cable routing and management.

Interface Cable and Wire Specifications for the SRX240 Services Gateway

 