SRX1400 Services Gateway Chassis Grounding Point

To meet safety and electromagnetic interference (EMI) requirements and to ensure proper operation, the services gateway must be adequately grounded before power is connected. A pair of threaded holes are provided for connecting the services gateway to earth ground on the rear of the chassis. Figure 55 shows the chassis ground point on the services gateway.

Figure 55: Grounding Point on the SRX1400 Services Gateway

Image g033542.gif

Related Documentation