Preparing the SRX110 Services Gateway for Rack-Mount, Desk-Mount, and Wall-Mount Installation

This topic includes the following sections:

Preparing the SRX110 Services Gateway for Rack-Mount Installation

You can mount an SRX110 Services Gateway on 4-post (telco) racks, enclosed cabinets, and open-frame racks.

Note: The SRX110 Services Gateway cannot be center-mounted in a rack.

Table 26 lists the tasks you need to perform before installing the device.

Table 26: SRX110 Services Gateway Preinstallation Checklist for Rack-Mount Installation

Task

Additional Information

Verify that the site meets the requirements.

Site Preparation Checklist for the SRX110 Services Gateway

Verify that the racks or cabinets meet the specific requirements.

SRX110 Services Gateway Rack Requirements

Place the rack or cabinet in its permanent location, allowing adequate clearance for airflow and maintenance, and secure it to the building structure.

Clearance Requirements for Airflow and Hardware Maintenance of the SRX110 Services Gateway

Remove the services gateway chassis from the shipping carton.

Unpacking the SRX110 Services Gateway

Verify that you have the following parts available in your rack-mounting kit for the SRX110 Services Gateway:

  • Rack-mounting brackets
  • Mounting screws
  • Power supply adapter tray with screws
  • Adapter stopper bracket
 

Adjust the power supply adapter tray.

Adjusting the Power Supply Adapter Tray for the SRX110 Services Gateway for Rack-Mount Installation

Note: The rack-mounting kit is not shipped with the device and must be ordered separately.

Preparing the SRX110 Services Gateway for Desk-Mount Installation

You can mount the services gateway on a desk or other level surface horizontally or vertically. The four rubber feet attached to the chassis provide stability.

Table 27 provides the list of tasks you need to perform before installing the device.

Table 27: SRX110 Services Gateway Preinstallation Checklist for Desk-Mount Installation

Task

Additional Information

Verify that the site meets the requirements.

Site Preparation Checklist for the SRX110 Services Gateway

Place the desk in its permanent location, allowing adequate clearance for airflow and maintenance, and secure it to the building structure.

Clearance Requirements for Airflow and Hardware Maintenance of the SRX110 Services Gateway

Remove the services gateway chassis from the shipping carton.

Unpacking the SRX110 Services Gateway

Verify that you have the following parts available in your desk-mounting kit to mount the SRX110 Services Gateway vertically:

  • Vertical stand
  • Screws

Note: If you are mounting the services gateway horizontally on a desk, ensure that the rubber feet are attached to the chassis.

Note: The vertical desk-mounting kit is not shipped with the device and must be ordered separately.

Preparing the SRX110 Services Gateway for Wall-Mount Installation

You can mount an SRX110 Services Gateway on a wall. The four rubber feet attached to the chassis provide stability.

Table 28 provides the list of tasks you need to perform before installing the device.

Table 28: SRX110 Services Gateway Preinstallation Checklist for Wall-Mount Installation

Task

Additional Information

Verify that the site meets the requirements.

Site Preparation Checklist for the SRX110 Services Gateway

Remove the services gateway chassis from the shipping carton.

Unpacking the SRX110 Services Gateway

Verify that you have the following parts available in your wall-mounting kit to mount the SRX110 Services Gateway on a wall:

  • Wall-mounting brackets
  • Screws

Note: The wall-mounting kit is not shipped with the device and must be ordered separately.