Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 

Tools and Parts Required for Installation

 Tip

The Quick Start Guide is designed to show the basic installation and startup procedures. For complete instructions see the QFX5200 Hardware Guide at QFX5200 Switch Hardware Guide

Gather the tools and equipment listed in Table 1 for installing the switch in a 4 post rack.

Table 1: Tools and Equipment Needed to Install QFX5200-32C and QFX5200-32C-L

Tools and Equipment

Provided/Not

Electrostatic discharge (ESD) grounding strap

Not provided

A Phillips (+) screwdriver, number 2

Not provided

One pair of rear mounting blades

Provided

One pair of front mounting rails

Provided

Twelve crews to secure the mounting rails to the chassis

Provided

Eight screws to secure the chassis and rear installation blades to the rack

Not provided

Grounding lug, Panduit LCD10-10A-L or equivalent, two 10-32 x 0.25 screws with #10 split-lock washers to secure the grounding lug to the grounding lug bracket protective earthing terminal

Not provided

Two power cords with plugs appropriate to your geographical location

Provided

RJ-45 cable and RJ-45 to DB-9 serial port adapter

Provided

A Management host, such as a laptop or PC, with an Ethernet port

Not Provided

An Ethernet cable with an RJ-45 connector attached

Provided

Register product serial numbers on the Juniper Networks website and update the installation base data if there is any addition or change to the installation base or if the installation base is moved. Juniper Networks will not be held accountable for not meeting the hardware replacement service-level agreement for products that do not have registered serial numbers or accurate installation base data.

Register your product(s) at https://tools.juniper.net/svcreg/SRegSerialNum.jsp.

Update your install base at https://www.juniper.net/customers/csc/management/updateinstallbase.jsp.