Site Preparation Checklist for EX3300 Switches
The checklist in Table 23 summarizes the tasks you need to perform when preparing a site for EX3300 switch installation.
Table 23: Site Preparation Checklist
Item or Task | For More Information | Performed by | Date |
---|---|---|---|
Environment | |||
Verify that environmental factors such as temperature and humidity do not exceed switch tolerances. | Environmental Requirements and Specifications for EX Series Switches | ||
Power | |||
Measure distance between external power sources and switch installation site. | |||
Locate sites for connection of system grounding. | |||
Calculate the power consumption and requirements. | |||
Hardware Configuration | |||
Choose the number and types of switches you want to install. | |||
Rack or Cabinet | |||
Verify that your rack or cabinet meets the minimum requirements for the installation of the switch. | |||
Plan rack or cabinet location, including required space clearances. | Clearance Requirements for Airflow and Hardware Maintenance for EX3300 Switches | ||
Secure the rack or cabinet to the floor and building structure. | |||
Wall | |||
Verify that the wall meets the minimum requirements for the installation of the switch. | Requirements for Mounting an EX3300 Switch on a Desktop or Wall | ||
Verify that there is appropriate clearance in your selected location. | Clearance Requirements for Airflow and Hardware Maintenance for EX3300 Switches | ||
Cables | |||
Acquire cables and connectors:
| |||
Plan the cable routing and management. |