Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

[an error occurred while processing this directive]

Chassis Lifting Guidelines for EX2200 Switches

Observe the following guidelines for lifting and moving an EX2200 switch:

  • Before installing the switch, read the guidelines in Site Preparation Checklist for EX2200 Switches to verify that the intended site meets the specified power, environmental, and clearance requirements.
  • Before lifting or moving the switch, disconnect all external cables.

Related Documentation

Modified: 2015-06-23