authentication-method

Syntax

authentication-method (pap | chap | none);

Hierarchy Level

[edit interfaces interface-name cellular-options gsm-options profiles profile-name]

Release Information

Statement introduced in Release 9.5 of Junos OS.

Description

Specify the authentication method for connection to a Global System for Mobile Communications (GSM) cellular network.

Options

pap—Password Authentication Protocol.

chap—Challenge Handshake Authentication Protocol.

none—No authentication method is used.

Usage Guidelines

For configuration instructions and examples, see the Junos OS Interfaces Configuration Guide for Security Devices.

Required Privilege Level

interface—To view this statement in the configuration.

interface-control—To add this statement to the configuration.