[Contents]
[Prev]
[Next]
[Report an Error]
Install the FEB
To install the FEB, follow this procedure (see Figure 29):
-
Verify that the power switch on both power supply faceplates is in the OFF (O)
position.
-
Attach an electrostatic discharge (ESD) grounding strap to your bare
wrist and connect the strap to one of the ESD points on the chassis. For more information about ESD, see Prevent Electrostatic Discharge Damage.
-
Verify that the ends of the ejector levers (which are located at each
end of the unit) are pulled away from the faceplate and are nearly perpendicular
to it.
-
Place one hand under the FEB to support it and grasp one of the ejector
levers at the front with the other hand.
-
Align the rear of the FEB with the guides inside the chassis and slide
it in completely.
-
Press the end of each ejector lever inward toward the FEB faceplate.
-
Replace the Routing Engine cover on the FEB faceplate, by sliding the
hooks at the bottom of the cover under the lower edge of the FEB ejector levers
and aligning the holes in the cover with the holes in the faceplate (the cover
is shown in Figure 3). Insert screws into the
five holes in the cover and use a Phillips screwdriver to tighten them.
-
Perform the procedures in Power On the Routerto power
on the router and verify correct startup.
-
Issue the show chassis feb command described
in Maintain the FEB to verify correct FEB functioning.
Figure 29: Install the FEB

[Contents]
[Prev]
[Next]
[Report an Error]