Symbols
- ( ), in syntax descriptions 1,
- [ ], in configuration statements 1,
- { }, in configuration statements 1,
- #, comments in configuration statements 1,
- < >, in syntax descriptions 1,
- | (pipe), in syntax descriptions 1,
A
- AC power cord
- connection instructions
- during initial installation 1,
- for maintenance or replacement 1,
- disconnection instructions 1,
- replacement instructions 1,
- specifications 1,
- tools required 1,
- AC power supply
- cord See AC power cord
- description (hardware and function) 1,
- grounding 1,
- installation instructions
- during initial installation 1,
- for maintenance or replacement 1,
- LEDs 1,
- maintenance 1,
- removal instructions
- during initial installation 1,
- for maintenance or replacement 1,
- serial number 1,
- specifications 1,
- tools required 1,
- troubleshooting 1,
- weight 1,
- agency approvals 1,
- airflow
- clearance required 1,
- path through chassis 1,
- alarm
- cutoff/lamp test button 1,
- LEDs (red and yellow) on craft interface 1,
- messages, list of 1,
- relay contacts
- connecting/disconnecting wire 1,
- description 1,
- tools required 1,
- wire specifications 1,
- alarms
- handling by Routing Engine 1,
- altitude, acceptable range 1,
- antistatic mat, using 1,
- application-specific integrated circuit See ASIC
- approvals, agency 1,
- architecture
- overview 1,
- Packet Forwarding Engine 1,
- Routing Engine 1,
- ASIC
- as key element of router design 1,
- Distributed Buffer Manager
- component on SSB 1,
- role in forwarding 1,
- I/O Manager
- component on FPC 1,
- role in forwarding 1,
- Internet Processor II
- component on SSB 1,
- role in forwarding 1,
- on FPC 1,
- on PIC 1,
- on SSB 1,
- ATM analyzer, use of 1,
- attenuation in fiber-optic cable 1,
- AUX/MODEM port See auxiliary port on craft interface
- auxiliary port (for Routing Engine management)
- cable
- connection during initial installation 1,
- connector pinouts (DB-9) 1,
- replacement instructions 1,
- specifications 1,
- tools required 1,
- auxiliary port on craft interface
- description 1,
B
- battery
- environmental compliance 1,
- lithium 1,
- braces, in configuration statements 1,
- brackets
- angle, in syntax descriptions 1,
- square, in configuration statements 1,
C
- cable
- auxiliary or console port (for Routing Engine management)
- connecting during initial installation 1,
- replacing 1,
- tools required 1,
- DC power and grounding
- connecting during maintenance 1,
- disconnecting for maintenance 1,
- tools required 1,
- Ethernet port (for Routing Engine management)
- connecting during initial installation 1,
- replacing 1,
- tools required 1,
- fiber-optic
- attenuation 1,
- cleaning instructions for transceivers 1,
- dispersion 1,
- multimode and single-mode 1,
- transmission distance, maximum 1,
- wavelength ranges 1,
- grounding See DC power and grounding cables
- PIC
- connecting during initial installation 1,
- maintaining 1,
- tools required 1,
- power See AC power cord; power cables
- cable management system
- description 1,
- fiber-optic cable, use with 1,
- weight 1,
- carton See shipping crate
- case number, for JTAC 1,
- center-mount rack See rack
- chassis
- airflow path through 1,
- alarm messages See alarm, messages
- description 1,
- grounding points 1,
- lifting guidelines 1,
- process (software module in Routing Engine) 1,
- weight 1,
- checklist
- FPC removal 1,
- checklist for site preparation 1,
- chromatic dispersion in fiber-optic cable 1,
- cleaning instructions
- fiber-optic transceivers 1,
- clearance, requirements for airflow and maintenance 1,
- CLI
- as troubleshooting tool 1,
- command
- to display chassis alarm messages 1,
- to display FPC status 1,
- to display PIC status 1,
- to display power supply status 1,
- to display Routing Engine status 1,
- to display serial number 1,
- tools provided in
- for accessing and controlling software 1,
- for monitoring software 1,
- command-line interface See CLI
- commands
- ping 1,
- show chassis alarms 1,
- show chassis environment 1,
- show chassis fpc 1,
- for FPC status 1,
- show chassis fpc pic-status 1,
- show chassis hardware 1,
- show chassis routing-engine 1,
- show chassis ssb 1,
- traceroute 1,
- comments, in configuration statements 1,
- compatibility, electromagnetic 1,
- compliance
- EMC requirements 1,
- general standards 1,
- components
- hardware See hardware components
- hot-pluggable See field-replaceable units
- hot-removable and hot-insertable See field-replaceable units
- redundancy 1,
- requiring power-down See field-replaceable units
- software See JUNOS software
- configuration
- files, storage by Routing Engine 1,
- router 1,
- console port (for Routing Engine management)
- cable
- connection during initial installation 1,
- connector pinouts (DB-9) 1,
- replacement instructions 1,
- specifications 1,
- tools required 1,
- console port on craft interface
- description 1,
- control packets, handling of 1,
- conventions
- notice icons 1,
- text and syntax 1,
- cooling system 1,
- description (hardware and function) 1,
- maintenance 1,
- redundancy 1,
- See also front fan tray, Routing Engine panel and fan tray
- craft interface
- alarm
- cutoff/lamp test button 1,
- relay contacts See alarm relay contacts
- description (hardware and function) 1,
- installation instructions 1,
- LEDs
- alarm (red and yellow) 1,
- FPC 1,
- Routing Engine 1,
- removal instructions 1,
- routine inspection of 1,
- Routing Engine ports See auxiliary port on craft interface, console port on craft interface, Ethernet port on craft interface
- serial number 1,
- tools required 1,
- crate See shipping crate
- curly braces, in configuration statements 1,
- customer support 1,
- contacting JTAC 1,
D
- data flow, through Packet Forwarding Engine 1,
- DB-9 cable connector pinouts (auxiliary and console ports) 1,
- DC power and grounding cables
- connection instructions
- during initial installation 1,
- for maintenance or replacement 1,
- disconnection instructions 1,
- lugs 1,
- specifications 1,
- tools required 1,
- DC power supply
- cables See DC power and grounding cables
- description (hardware and function) 1,
- grounding 1, 2,
- installation instructions
- during initial installation 1,
- for maintenance or replacement 1,
- LEDs 1,
- maintenance 1,
- removal instructions
- during initial installation 1,
- for maintenance or replacement 1,
- serial number 1,
- specifications 1,
- tools required 1,
- troubleshooting 1,
- weight 1,
- dispersion in fiber-optic cable 1,
- Distributed Buffer Manager ASIC
- component on SSB 1,
- role in forwarding 1,
- documentation set
- comments on 1,
E
- E1 PIC, pinouts for RJ-48 cable 1,
- earthquakes
- site preparation for 1,
- tested toleration for seismic 1,
- EIA-530 PIC, pinouts for X.21 cable 1, 2,
- EIA rack standards 1,
- electrical specifications See specifications
- electricity
- safety warnings 1,
- site wiring guidelines 1,
- electromagnetic
- compatibility See EMC
- pulse 1,
- electrostatic
- bag, using to store components 1,
- discharge See ESD
- EMC (EMI)
- compliance with requirements 1,
- standards 1,
- suppression 1,
- EMP 1,
- environmental specifications 1,
- ESD
- points on chassis 1,
- preventing damage to components by 1,
- Ethernet port (for Routing Engine management)
- cable
- connection during initial installation 1,
- replacement instructions 1,
- specifications 1,
- tools required 1,
- Ethernet port on craft interface
- description 1,
- ETSI rack standards 1,
- exception packets, handling of 1,
F
- fan tray
- troubleshooting 1,
- Fast Ethernet 12-port PIC, pinouts for RJ-21 cable 1,
- fiber-optic cable See cable, fiber-optic
- field-replaceable units (FRUs) 1,
- fire safety specifications 1,
- Flexible PIC Concentrator See FPC
- font conventions 1,
- forwarding tables 1,
- FPC
- ASICs on 1,
- blank panels 1,
- components 1,
- description (hardware and function) 1,
- installation instructions
- during initial installation 1,
- for maintenance or replacement 1,
- LEDs 1,
- maintenance 1,
- offline button 1,
- removal instructions
- during initial installation 1,
- for maintenance or replacement 1,
- serial number 1,
- status, checking 1,
- tools required 1,
- troubleshooting 1,
- weight 1,
- front fan tray
- description 1,
- installation instructions
- during initial installation 1,
- for maintenance or replacement 1,
- maintenance 1,
- removal instructions
- during initial installation 1,
- for maintenance or replacement 1,
- tools required 1,
- weight 1,
- front impeller assembly
- troubleshooting 1,
- front-mount rack See rack
- FRUs 1,
G
- grounding (electrical) specifications
- AC-powered router 1,
- DC-powered router 1,
- grounding cables
- lugs 1,
- guidelines See specifications
H
- hardware components
- FPC 1,
- midplane 1,
- overview 1,
- PIC 1,
- power requirements 1,
- reinstallation of all during initial installation 1,
- removal of all during initial installation 1,
- returning for repair or replacement 1,
- Routing Engine 1,
- SSB 1,
- weight 1,
- higher-order mode loss (HOL) 1,
- hot-pluggable components See field-replaceable units
- hot-removable and hot-insertable components See field-replaceable units
- humidity (relative), acceptable 1,
I
- I/O Manager ASIC
- on FPC 1,
- role in forwarding 1,
- immunity standards 1,
- installation instructions
- AC power cord
- during initial installation 1,
- for maintenance or replacement 1,
- AC power supply
- during initial installation 1,
- for maintenance or replacement 1,
- alarm relay contact wires
- for maintenance or replacement 1,
- tools required 1,
- during initial installation 1,
- cable, auxiliary or console port (for Routing Engine management)
- for maintenance or replacement 1,
- tools required 1,
- during initial installation 1,
- cable, Ethernet port (for Routing Engine management)
- for maintenance or replacement 1,
- tools required 1,
- during initial installation 1,
- cable, PIC
- during initial installation 1,
- chassis using mechanical lift 1,
- tools required 1,
- chassis without mechanical lift 1,
- tools required 1,
- craft interface 1,
- DC power and grounding cables
- during initial installation 1,
- for maintenance or replacement 1,
- tools required 1,
- DC power supply
- during initial installation 1,
- for maintenance or replacement 1,
- FPC
- during initial installation 1,
- for maintenance or replacement 1,
- front fan tray
- during initial installation 1,
- for maintenance or replacement 1,
- PC Card 1,
- PIC 1,
- router
- preparation for 1,
- Routing Engine
- during initial installation 1,
- for maintenance or replacement 1,
- Routing Engine panel and fan tray
- during initial installation 1,
- for maintenance or replacement 1,
- SFP 1,
- SSB
- during initial installation 1,
- for maintenance or replacement 1,
- instructions
- calculation
- power requirements 1,
- cleaning See cleaning instructions
- installation See installation instructions
- maintenance
- AC power supply 1,
- cooling system 1,
- DC power supply 1,
- front fan tray 1,
- PIC 1,
- Routing Engine 1,
- Routing Engine panel and fan tray 1,
- SSB 1,
- removal See removal instructions
- site preparation 1,
- unpacking the router 1,
- interface
- command-line See CLI
- network See PIC
- process (software module in Routing Engine) 1,
- interference
- electromagnetic 1,
- radio frequency 1,
- Internet Processor II ASIC
- component on SSB 1,
- role in forwarding 1,
J
- Juniper Networks Technical Assistance Center (JTAC) 1,
- JUNOS software
- chassis process 1,
- CLI See CLI
- interface process 1,
- kernel (Routing Engine) 1,
- management process 1,
- MIB II process 1,
- modularity and scalability 1,
- overview 1,
- role in system architecture 1,
- routing protocol process 1,
- SNMP process 1,
- tools
- for accessing and configuring 1,
- for monitoring 1,
- upgrade of 1,
- VPNs 1,
K
- kernel (software in Routing Engine) 1,
L
- lamp test button 1,
- laser safety guidelines 1,
- LEDs
- AC power supply 1,
- alarm (red and yellow on craft interface)
- description 1,
- troubleshooting use 1,
- DC power supply 1,
- FPC 1,
- PIC 1,
- Routing Engine 1, 2, 3,
- safety warnings 1,
- SSB 1,
- link loss, calculating 1,
- lithium battery compliance 1,
- load sharing (power supplies) 1,
- lugs for DC power and grounding cables 1,
- lugs for grounding cables 1,
M
- maintenance
- warnings 1,
- maintenance guidelines
- AC power supply 1,
- cable
- PIC 1,
- cooling system 1,
- DC power supply 1,
- FPC 1,
- front fan tray 1,
- overview 1,
- PIC 1,
- Routing Engine 1,
- Routing Engine panel and fan tray 1,
- SSB 1,
- management
- port See Ethernet port on craft interface
- process (software module of Routing Engine) 1,
- manuals
- comments on 1,
- MGMT port See Ethernet port on craft interface
- MIB II process (software module in Routing Engine) 1,
- midplane
- description 1,
- modal dispersion in fiber-optic cable 1,
- mode loss, higher-order 1,
- MPLS protocols 1,
- multicast routing protocols 1,
- multimode fiber-optic cable See cable, fiber-optic
N
- NEBS standards 1,
- network cable See cable, fiber-optic; cable, PIC
- notice icons 1,
O
- offline button
- FPC 1,
- Routing Engine 1,
- SSB 1,
P
- Packet Forwarding Engine
- architectural components 1,
- ASICs, diagram of 1,
- data flow through 1,
- hardware components listed 1,
- packing crate See shipping crate
- parentheses, in syntax descriptions 1,
- PC Card
- insertion instructions 1,
- removal instructions 1,
- PFE See Packet Forwarding Engine
- Physical Interface Card See PIC
- PIC
- ASIC on 1,
- ATM, use of analyzer 1,
- cable
- tools required 1,
- components 1,
- description (hardware and function) 1,
- E1, pinouts for RJ-48 cable 1,
- EIA-530, pinouts for X.21 cable 1, 2,
- Fast Ethernet 12-port, pinouts for RJ-21 cable 1,
- installation instructions 1,
- LEDs 1,
- maintenance 1,
- removal instructions 1,
- serial number 1,
- SONET/SDH
- alarm messages 1,
- analyzer, use of 1,
- status, checking 1,
- T1, pinouts for RJ-48 cable 1,
- tools required 1,
- troubleshooting 1,
- PICs
- SONET/SDH
- fiber-optic power budget calculation 1,
- ping command 1,
- pinouts
- DB-9 cable connector ports (auxiliary/console) 1,
- RJ-21 cable 1,
- RJ-45 Ethernet cable connector port 1,
- RJ-48 cable 1,
- V.35 cable 1,
- X.21 cable 1,
- policy, routing 1,
- port
- auxiliary on craft interface See auxiliary port on craft interface
- console on craft interface See console port on craft interface
- Ethernet on craft interface See Ethernet port on craft interface
- power
- AC
- connection instructions during initial installation 1,
- connection instructions for maintenance 1,
- disconnection instructions 1,
- cables and cords See AC power cords; power and grounding cables
- DC
- connection instructions 1,
- connection instructions during initial installation 1,
- disconnection instructions 1, 2,
- fiber-optic budget calculation 1,
- margin calculation 1,
- requirements for hardware components 1,
- supply See AC power supply, DC power supply
- AC See AC power supply
- DC See DC power supply
- surges 1,
- system
- load sharing 1,
- redundancy 1,
- specifications 1,
- procedures See instructions
R
- rack
- clearance required 1,
- mounting hole spacing 1,
- securing to building 1,
- size and strength required 1,
- standards, EIA and ETSI 1,
- radio frequency interference, preventing 1,
- rear lower impeller assembly
- troubleshooting 1,
- rear upper impeller assembly
- troubleshooting 1,
- redundancy
- components 1,
- cooling system 1,
- power system 1,
- regulatory compliance 1,
- relative humidity, acceptable 1,
- removal instructions
- AC power cord 1,
- AC power supply
- during initial installation 1,
- for maintenance or replacement 1,
- alarm relay contact wires 1,
- cable
- auxiliary or console port (for Routing Engine management) 1,
- Ethernet port (for Routing Engine management) 1, 2,
- craft interface 1,
- DC power and grounding cables 1,
- DC power supply
- during initial installation 1,
- for maintenance or replacement 1,
- FPC
- during initial installation 1,
- for maintenance or replacement 1,
- front fan tray
- during initial installation 1,
- for maintenance or replacement 1,
- PC Card 1,
- PIC 1,
- Routing Engine
- during initial installation 1,
- for maintenance or replacement 1,
- Routing Engine panel and fan tray
- during initial installation 1,
- for maintenance or replacement 1,
- SFP 1,
- SSB
- during initial installation 1,
- for maintenance or replacement 1,
- replacement instructions See installation instructions, removal instructions
- requirements See specifications
- reset button on Routing Engine 1,
- RFI 1,
- RJ-21 cable pinouts 1,
- RJ-45 cable connector pinouts 1,
- RJ-48 cable pinouts 1,
- router
- configuration 1,
- packing for shipment 1,
- routing
- policy 1,
- protocol process (software module of Routing Engine) 1,
- protocols
- IPv4 1,
- IPv6 1,
- tables 1,
- Routing Engine
- alarm handling by 1,
- chassis process 1,
- components
- hardware 1,
- software 1,
- configuration files, storage 1,
- description (hardware and function) 1,
- installation instructions
- during initial installation 1,
- for maintenance or replacement 1,
- interface process 1,
- kernel 1,
- LEDs 1, 2, 3,
- maintenance 1,
- management ports
- tools required 1,
- cable and wire specifications 1,
- management process 1,
- MIB II process 1,
- offline button 1,
- packet counting 1,
- panel and fan tray See Routing Engine panel and fan tray
- pinouts for cable connections 1,
- ports on craft interface 1,
- description 1,
- See also auxiliary port on craft interface, console port on craft interface, Ethernet port on craft interface
- removal instructions
- during initial installation 1,
- for maintenance or replacement 1,
- reset button 1,
- role in system architecture 1,
- routing
- protocol process 1,
- table maintenance 1,
- serial number 1,
- SNMP process 1,
- status, displaying 1,
- status indicator lights 1,
- tools required 1,
- weight 1,
- Routing Engine panel and fan tray
- description 1,
- installation instructions
- during initial installation 1,
- for maintenance or replacement 1,
- maintenance 1,
- removal instructions
- during initial installation 1,
- for maintenance or replacement 1,
- tools required 1,
- weight 1,
S
- safety information 1,
- See also warnings
- safety standards 1,
- seismic (earthquake) 1,
- serial number
- AC power supply 1,
- craft interface 1,
- DC power supply 1,
- FPC 1,
- in output from show chassis hardware command 1,
- PIC 1,
- Routing Engine 1,
- SSB 1,
- SFP
- installation instructions 1,
- removal instructions 1,
- shipping crate
- repacking 1,
- unpacking the router 1,
- show chassis alarms command 1,
- show chassis environment command 1,
- show chassis fpc command 1,
- for FPC status 1,
- show chassis fpc pic-status command 1,
- show chassis hardware command 1,
- show chassis routing-engine command 1,
- show chassis ssb command 1,
- signal dispersion 1,
- signaling, distance limitations 1,
- Simple Network Management Protocol See SNMP
- single-mode fiber-optic cable See cable, fiber-optic
- site
- electrical wiring specifications 1,
- environmental specifications 1,
- preparation
- instructions 1,
- preparation checklist 1,
- routine inspection 1,
- small form-factor pluggable See SFP
- SNMP
- as tool for monitoring 1,
- process (software module in Routing Engine) 1,
- software, JUNOS See JUNOS software
- SONET/SDH analyzer, use of 1,
- specifications
- AC power cord 1,
- AC power supply 1,
- cable 1,
- DC power and grounding 1
- Routing Engine management ports 1
- See also cable, PIC
- clearance 1,
- DC power supply 1,
- electrical 1, 2,
- cable and wiring 1
- grounding 1
- environmental 1,
- fire safety 1,
- power
- drawn by hardware components 1
- system 1
- rack
- connection to building structure 1
- mounting hole spacing 1
- size and strength 1
- thermal output 1,
- wires to external alarm-reporting devices 1,
- SSB
- ASICs on 1,
- components 1,
- description (hardware and function) 1,
- installation instructions
- during initial installation 1
- for maintenance or replacement 1
- LEDs 1,
- maintenance 1,
- offline button 1,
- removal instructions
- during initial installation 1
- for maintenance or replacement 1
- serial number 1,
- status, checking 1,
- tools required 1,
- weight 1,
- standards compliance 1,
- status indicator lights for Routing Engine 1,
- support, technical See technical support
- surge protection 1,
- syntax conventions 1,
- system
- architecture 1,
- description 1,
- System and Switch Board See SSB
T
- T1 PIC, pinouts for RJ-48 cable 1,
- tables, routing and forwarding 1,
- technical support
- contacting JTAC 1,
- telco rack See rack
- temperature, acceptable range 1,
- thermal output 1,
- tolerances
- environmental 1,
- tools required
- chassis
- installation using mechanical lift 1
- installation without mechanical lift 1
- returning for repair or replacement 1
- cooling system maintenance 1,
- hardware components
- returning for repair or replacement 1
- replacing on operational router 1
- Packet Forwarding Engine maintenance 1,
- traceroute command 1,
- transmission distances, fiber-optic cable 1,
- troubleshooting
- CLI commands 1,
- cooling system 1,
- FPC 1,
- LEDs
- craft interface 1
- hardware components 1
- overview 1
- PIC 1
- power system 1
U
- U (rack unit) 1,
- unicast routing protocols
- IPv4 1
- IPv6 1
V
- V.35 cable pinouts 1,
W
- warnings
- electrical 1
- general 1
- installation 1
- laser and LED 1
- levels defined 1
- maintenance and operational 1
- wavelength ranges supported by fiber-optic cable 1,
- weight
- chassis 1
- hardware components 1
- wiring, electrical See electricity
X
- X.21 cable pinouts 1