[
Contents]
[
Prev]
[
Next]
[
Index]
[
Report an Error]
Installing the Craft Interface
To install the craft interface, follow this procedure (see Figure 49):
- Verify that the router is powered off. If necessary,
halt the Routing Engine software and power off the power supplies
as described in Removing the Craft Interface.
- Attach
an electrostatic discharge (ESD) grounding strap to your bare wrist
and connect the strap to one of the ESD points on the chassis. Verify
that the router is attached to a proper earth ground. For more information about ESD, see Preventing
Electrostatic Discharge Damage.
- Place one hand under the craft interface to support it
and grasp one of the ejector levers at the front with the other hand.
- Align the rear of the craft interface with the
guides inside the chassis and slide it in completely.
- Press the ejector lever at each end of the craft
interface inward toward the faceplate.
- Tighten the thumbscrew at each end of the craft
interface faceplate until the craft interface is seated firmly in
the chassis.
- Reattach an external management device to one of
the Routing Engine ports on the craft interface (AUX/MODEM, CONSOLE, or MGMT). If two Routing
Engines are installed, connect to the Routing Engine that is configured
to become the master, which by default is the Routing Engine in slot RE0. For more information, see Routing Engine.
Also reattach alarm relay contacts if desired. For instructions, see Replacing Connections to Routing Engine Interface Ports.
Figure 49: Installing
the Craft Interface

[
Contents]
[
Prev]
[
Next]
[
Index]
[
Report an Error]