The checklist in Table 20 summarizes the tasks you need to perform when preparing a site for router installation.
Table 20: Site Preparation Checklist
|
Item or Task |
Performed By |
Date |
Notes |
|---|---|---|---|
|
Verify that environmental factors such as temperature and humidity do not exceed router tolerances (see Routing Node Environmental Specifications). |
|||
|
Measure distance between external power sources and router installation site. |
|||
|
Select the type of rack or cabinet. |
|||
|
Plan rack or cabinet location, including required space clearances. |
|||
|
If a rack is used, secure rack to floor and building structure. |
|||
|
Acquire cables and connectors. |
|||
|
Locate sites for connection of system grounding. |
|||
|
Calculate power budget and power margin. |