[Contents] [Prev] [Next] [Index] [Report an Error]

Powering On the Router

To power on the router, follow this procedure:

  1. Verify that the power supplies are fully inserted in the chassis and the thumbscrews on their faceplates are tightened.
  2. For each power supply, verify that the source power cables are connected to the appropriate terminal on the circuit breaker box: the positive (+) source cable to the return terminal (labeled RTN(+)) and the negative (–) source cable to the input terminal (labeled –48V).
  3. Verify that an external management device is connected to one of the Routing Engine ports on the CIP (AUXILIARY, CONSOLE, or ETHERNET). For more information on connecting management devices, see Connecting the Router to Management and Alarm Devices.
  4. Turn on the power to the external management device.
  5. Press one power switch on the circuit box to the ON ( | ) position.
  6. Observe the LEDs on the power supply faceplate:

    After powering off a power supply, wait at least 60 seconds before turning it back on. After powering on a power supply, wait at least 60 seconds before turning it off.

    If the router is completely powered down when you power on the power supply, the Routing Engine boots as the power supply completes its startup sequence. If the Routing Engine finishes booting and you need to power down the router again, first issue the CLI request system halt command. For more information, see Disconnecting Power from the Router.

    After a power supply is powered on, it can take up to 60 seconds for status indicators—such as LEDs on the power supply, show chassis commands, and messages on the craft interface LCD—to indicate that the power supply is functioning normally. Ignore error indicators that appear during the first 60 seconds.

  7. Press the other power switch on the circuit breaker box to the ON ( | ) position and observe the LEDs on the second power supply faceplate. They should light as described in the previous step.

    If the LEDs are not lit in the appropriate pattern after 60 seconds, repeat the power supply and cable installation procedures described in Reinstalling the Power Supplies and Connecting Power to the Router.

  8. On the external management device connected to the Routing Engine, monitor the startup process to verify that the system has booted properly.

[Contents] [Prev] [Next] [Index] [Report an Error]