[ Contents] [ Prev] [ Next] [ Index] [ Report an Error]

Installing and Connecting a Services Router

Make the appropriate preparations and verify the J Series equipment before installing a J Series Services Router and connecting it to a power source and the network.

Caution: Do not install a combination of modules in a single chassis that exceeds the maximum power and heat capacity of the chassis. If J Series power management is enabled, PIMs and modules (PIMs or PIMs plus a WXC Integrated Services Module) that exceed the maximum power and heat capacity remain offline when the chassis is powered on.

This chapter contains the following topics:


[ Contents] [ Prev] [ Next] [ Index] [ Report an Error]