Technical Documentation

Routine Maintenance Procedures for the SRX5800 Services Gateway

Purpose

For optimum services gateway performance, perform preventive maintenance procedures regularly.

Action

  • Inspect the installation site for moisture, loose wires or cables, and excessive dust. Make sure that airflow is unobstructed around the device and into the air intake vents.
  • Check the status-reporting devices on the craft interface—System alarms and LEDs.
  • Inspect the air filter at the bottom front of the services gateway, replacing it every six months for optimum cooling system performance. Do not run the device for more than a few minutes without the air filter in place.

Published: 2009-11-03