Site Preparation Checklist for the SRX650 Services Gateway
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for installing the SRX650 Services Gateway.
Table 1: Site Preparation Checklist for SRX650 Services Gateway Installation
Item or Task | Additional Information | Performed By | Date | Notes |
|---|---|---|---|---|
Power | ||||
Measure distance between external power sources and device installation site. | ||||
Locate sites for connection of system grounding. | ||||
Calculate the power consumption and requirements. | SRX650 Services Gateway AC Power Supply Electrical Specifications and SRX650 Services Gateway DC Power Supply Electrical Specifications | |||
Environment | ||||
Verify that environmental factors such as temperature and humidity do not exceed device tolerances. | ||||
Rack Installation | ||||
Verify that your rack meets the minimum requirements. | ||||
Plan rack location, including required space clearances. | SRX650 Services Gateway Spacing of Mounting Bracket and Flange Holes | |||
Secure the rack to the floor and building structure. | Connecting the SRX650 Services Gateway to the Building Structure | |||
Cabinet Installation | ||||
Verify that your cabinet meets the minimum requirements. | SRX650 Services Gateway Cabinet Size and Clearance Requirements | |||
Plan the cabinet location, including required space clearances. | ||||
Cables | ||||
Acquire cables and connectors. | Interface Cabling and Wiring Specifications for the SRX650 Services Gateway | |||
Review the maximum distance allowed for each cable. Choose the length of cable based on the distance between the hardware components being connected. | ||||
Plan the cable routing and management. | ||||