Installation Overview for the SRX240 Services Gateway
After you have prepared your installation site, you are ready to unpack and install the services gateway. It is important to proceed through the installation process as shown in Table 1.
Table 1: Installation Process Order for the SRX240 Services Gateway
Steps | Process | For more information, see |
|---|---|---|
1 | Review the safety guidelines. | SRX240 Services Gateway Safety Requirements, Warnings, and Guidelines |
2 | Verify that you have prepared your site for the installation of the services gateway using the checklist. | |
3 | Unpack the services gateway and verify that the parts are received. | |
4 | Prepare the services gateway for installation. | |
5 | Install the services gateway. | |
6 | Connect the power supply | SRX240 Services Gateway AC Power Specifications and Requirements (For SRX240 Services Gateway Low Memory, High Memory with AC Power Supply, PoE, and Integrated Convergence Services) |
Connecting the SRX240 Services Gateway High Memory with DC Power Supply Model to a DC Power Source (For SRX240 Services Gateway High Memory with DC Power Supply model) | ||
7 | Connect cables to external devices. | Connecting and Organizing Interface Cables to the SRX240 Services Gateway |
8 | Connect the grounding cable. | |
9 | Power on the services gateway. |

