Technical Documentation

Installation Overview for the SRX240 Services Gateway

After you have prepared your installation site, you are ready to unpack and install the services gateway. It is important to proceed through the installation process as shown in Table 1.

Table 1: Installation Process Order for the SRX240 Services Gateway

Steps

Process

For more information, see

1

Review the safety guidelines.

SRX240 Services Gateway Safety Requirements, Warnings, and Guidelines

2

Verify that you have prepared your site for the installation of the services gateway using the checklist.

Site Preparation Checklist for the SRX240 Services Gateway

3

Unpack the services gateway and verify that the parts are received.

Unpacking the SRX240 Services Gateway

4

Prepare the services gateway for installation.

Preparing the SRX240 Services Gateway for Installation

5

Install the services gateway.

Installing the SRX240 Services Gateway

6

Connect the power supply

SRX240 Services Gateway AC Power Specifications and Requirements

(For SRX240 Services Gateway Low Memory, High Memory with AC Power Supply, PoE, and Integrated Convergence Services)

Connecting the SRX240 Services Gateway High Memory with DC Power Supply Model to a DC Power Source

(For SRX240 Services Gateway High Memory with DC Power Supply model)

7

Connect cables to external devices.

Connecting and Organizing Interface Cables to the SRX240 Services Gateway

8

Connect the grounding cable.

Grounding the SRX240 Services Gateway

9

Power on the services gateway.

Powering On and Powering Off the SRX240 Services Gateway


Published: 2010-05-03