Installing an SRX5800 Services Gateway SCB
To install an SCB (see Figure 1):
- Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to one of the ESD points on the chassis.
- Power-off the services gateway.
- Carefully align the sides of the SCB with the guides inside the chassis.
- Slide the SCB into the chassis until you feel resistance, carefully ensuring that it is correctly aligned.
- Grasp both ejector handles and rotate them simultaneously clockwise until the SCB is fully seated.
- Place the ejector handles in the proper position, vertically and toward the center of the board.
- Power-on the services gateway. The OK LED on the power supply faceplate should blink, then light steadily.
- To verify that the SCB is functioning normally,
check the LEDs on its faceplate. The green OK/FAIL LED should
light steadily a few minutes after the SCB is installed. If the OK/FAIL LED is red, remove and install the SCB again. If the OK/FAIL LED still lights steadily, the SCB is not functioning
properly. Contact your customer support representative.
To check the status of the SCB:
user@host> show chassis environment cbCB 0 status: State Online Master Temperature 30 degrees C / 86 degrees F Power 1 1.2 V 1202 mV 1.5 V 1511 mV 1.8 V 1798 mV 2.5 V 2481 mV 3.3 V 3306 mV 5.0 V 4956 mV 12.0 V 12084 mV 1.25 V 1250 mV 3.3 V SM3 3287 mV 5.0 V RE 5046 mV 12.0 V RE 11910 mV Power 2 11.3 V bias PEM 11292 mV 4.6 V bias MidPlane 4833 mV 11.3 V bias FPD 11156 mV 11.3 V bias POE 0 11253 mV 11.3 V bias POE 1 11272 mV Bus Revision 42 FPGA Revision 1 CB 1 status: State Online Temperature 31 degrees C / 87 degrees F Power 1 1.2 V 1205 mV 1.5 V 1508 mV 1.8 V 1817 mV 2.5 V 2507 mV 3.3 V 3306 mV 5.0 V 5053 mV 12.0 V 12200 mV 1.25 V 1256 mV 3.3 V SM3 3306 mV 5.0 V RE 5091 mV 12.0 V RE 0 mV Power 2 11.3 V bias PEM 11214 mV 4.6 V bias MidPlane 4821 mV 11.3 V bias FPD 11350 mV 11.3 V bias POE 0 11350 mV 11.3 V bias POE 1 11330 mV Bus Revision 42 FPGA Revision 0
Figure 1: Installing an SCB


