Preparing the SRX210 Services Gateway for Rack-Mount Installation
You can mount an SRX210 Services Gateway on four-post (telco) racks, enclosed cabinets, and open-frame racks.
![]() | Note: The SRX210 Services Gateway cannot be center-mounted in racks. |
Table 1 provides the list of tasks you need to perform before installing the device.
Table 1: SRX210 Services Gateway Preinstallation Checklist for Rack-Mount Installation
Task | Additional Information |
|---|---|
Verify that the site meets the requirements. | |
Verify that the racks or cabinets meet the specific requirements. | |
Place the rack or cabinet in its permanent location, allowing adequate clearance for airflow and maintenance, and secure it to the building structure. | Clearance Requirements for Airflow and Hardware Maintenance of the SRX210 Services Gateway |
Remove the services gateway chassis from the shipping carton. | |
Verify that you have the following parts available in your rack-mounting kit for the SRX210 Services Gateway:
| |
Adjust the power supply adapter tray. | Adjusting the Power Supply Adapter Tray for the SRX210 Services Gateway for Rack-Mount Installation |
![]() | Note: The rack-mounting kit is not shipped with the device and must be ordered separately. |
Related Topics
- Site Preparation Checklist for the SRX210 Services Gateway
- Clearance Requirements for Airflow and Hardware Maintenance of the SRX210 Services Gateway
- Unpacking the SRX210 Services Gateway
- Preparing the SRX210 Services Gateway for Rack-Mount, Desk-Mount, and Wall-Mount Installation
- Preparing the SRX210 Services Gateway for Desk-Mount Installation
- Preparing the SRX210 Services Gateway for Wall-Mount Installation


