Technical Documentation

Installing the MX480 Router Cable Management Bracket

The cable management brackets attach to both sides of the router. To install the cable management brackets (see Figure 1):

  1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to one of the ESD points on the chassis.
  2. Position the cable management brackets on the front sides of the chassis.
  3. Insert the tabs into the slots.
  4. Tighten the captive screws completely.

Figure 1: Installing the Cable Management Brackets

Image g004260.gif


Published: 2010-08-02

Help
|
My Account
|
Log Out