Site Preparation Checklist for the SRX100 Services Gateway
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for installing the SRX100 Services Gateway.
Table 1: Site Preparation Checklist for Services Gateway Installation
Item or Task | Additional Information | Performed By | Date | Notes |
|---|---|---|---|---|
Environment | ||||
Verify that environmental factors such as temperature and humidity do not exceed device tolerances. | ||||
Power | ||||
| SRX100 Services Gateway Site Electrical Wiring Guidelines SRX100 Services Gateway Power Specifications and Requirements | |||
Rack Requirements | ||||
Verify that your rack meets the minimum requirements. | ||||
Rack Installation | ||||
| Preparing the SRX100 Services Gateway for Rack-Mount Installation | |||
Cabinet Requirements | ||||
| ||||
Wall Installation | ||||
| Preparing the SRX100 Services Gateway for Wall-Mount Installation | |||
Desktop Installation | ||||
| Preparing the SRX100 Services Gateway for Desk-Mount Installation | |||
Cables | ||||
| Interface Cable and Wire Specifications for the SRX100 Services Gateway | |||

