Site Preparation Checklist for EX4500 Switches
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for EX4500 switch installation.
Table 1: Site Preparation Checklist
Item or Task | For More Information | Performed By | Date |
|---|---|---|---|
| Environment | |||
Verify that environmental factors such as temperature and humidity do not exceed switch tolerances. | Environmental Requirements and Specifications for EX Series Switches | ||
| Power | |||
Measure distance between external power sources and switch installation site. | |||
Locate sites for connection of system grounding. | |||
Calculate the power consumption and requirements. | |||
| Hardware Configuration | |||
Choose the number and types of switches you want to install. | |||
| Rack or Cabinet | |||
Verify that your rack or cabinet meets the minimum requirements for the installation of the switch. | |||
Plan rack or cabinet location, including required space clearances. | Clearance Requirements for Airflow and Hardware Maintenance for EX4500 Switches | ||
Secure the rack or cabinet to the floor and building structure. | |||
| Cables | |||
Acquire cables and connectors:
| |||
Plan the cable routing and management. | |||