Site Preparation Checklist for the SRX240 Services Gateway
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for installing the SRX240 Services Gateway.
Table 1: Site Preparation Checklist for Services Gateway Installation
Item or Task | Additional Information | Date and Notes |
|---|---|---|
| Environment | ||
Verify that environmental factors such as temperature and humidity do not exceed device tolerances. | ||
| Power | ||
Measure distance between external power sources and device installation site. | ||
Locate sites for connection of system grounding. | ||
Gather the AC power requirements. | SRX240 Services Gateway AC Power Specifications and Requirements | |
Gather the DC power requirements. | SRX240 Services Gateway DC Power Specifications and Requirements | |
| Rack Installation | ||
| ||
| Cables | ||
| Interface Cable and Wire Specifications for the SRX240 Services Gateway | |