Site Preparation Checklist for the SRX210 Services Gateway
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for installing the SRX210 Services Gateway.
Table 1: Site Preparation Checklist for the SRX210 Services Gateway Installation
Item or Task | Additional Information | Date and Notes |
|---|---|---|
| Environment | ||
Verify that environmental factors such as temperature and humidity do not exceed device tolerances. | ||
| Power | ||
| SRX210 Services Gateway Site Electrical Wiring Guidelines SRX210 Services Gateway Power Specifications and Requirements | |
| Rack Installation | ||
| ||
| Cabinet Installation | ||
| ||
| Wall Installation | ||
| Preparing the SRX210 Services Gateway for Wall-Mount Installation | |
| Desktop Installation | ||
| Preparing the SRX210 Services Gateway for Desk-Mount Installation | |
| Cables | ||
| Interface Cable and Wire Specifications for the SRX210 Services Gateway | |
Related Topics
- SRX210 Services Gateway Specifications
- General Site Guidelines for Installing the SRX210 Services Gateway
- Installation Overview for the SRX210 Services Gateway
- SRX210 Services Gateway Cabinet Requirements
- SRX210 Services Gateway Rack Requirements
- Clearance Requirements for Airflow and Hardware Maintenance of the SRX210 Services Gateway