MX80 Site Preparation Checklist

The checklist in Table 1 summarizes the tasks you must perform when preparing a site for router installation.

Table 1: MX80 Site Preparation Checklist

Item or Task

For More Information

Performed By

Date

Verify that environmental factors such as temperature and humidity do not exceed router tolerances.

MX80 Router Environmental Specifications

  

Select the type of rack or cabinet.

MX80 Router Rack Requirements,
MX80 Router Cabinet Requirements and Specifications

  

Plan rack or cabinet location, including required space clearances.

MX80 Router Rack Requirements,
MX80 Router Clearance Requirements for Airflow and Hardware Maintenance,
MX80 Router Cabinet Requirements and Specifications

  

If a rack is used, secure rack to floor and building structure.

MX80 Router Rack Requirements

  

Acquire cables and connectors.

   

Locate sites for connection of system grounding.

MX80 Router Grounding Specifications

  

Measure distance between external power sources and router installation site.

   

Calculate the optical power budget and optical power margin.

Calculating Power Budget and Power Margin for Fiber-Optic Cables

  