TX Matrix Plus Installation Safety Guidelines
Observe the following guidelines before and during router installation:
General Installation Safety Guidelines
Before installing the router, verify that the intended site meets the specified power, environmental, and clearance requirements.
See the following topics:
- TX Matrix Plus Clearance Requirements for Airflow and Hardware Maintenance
- Rack Requirements for a TX Matrix Plus Router
- TX Matrix Plus Router Environmental Specifications
- TX Matrix Plus Router Power Requirements
- TX Matrix Plus Power Distribution
Chassis Lifting Guidelines
The weight of a fully configured TX Matrix Plus chassis is about 925 lb (420 kg). Observe the following guidelines for lifting and moving the router:
- Do not attempt to manually lift a fully configured TX Matrix Plus router. A mechanical lift is required to maneuver the router into a rack.
- Before using the mechanical lift to move the router, disconnect all external cables.