[Contents] [Prev] [Next] [Index] [Report an Error]

tunnel-limit

Syntax

tunnel-limit limit;

Hierarchy Level

[edit logical-systems logical-system-name routing-instances routing-instance-name protocols pim mdt],
[edit routing-instances routing-instance-name protocols pim mdt]

Release Information

Statement introduced before JUNOS Release 7.4.

Description

Limit the number of data MDTs created in this VRF instance. If the limit is 0, then no data MDTs are created for this VRF instance.

Options

limit—Maximum number of data MDTs for this VRF instance.

Range: 0 through 1024
Default: 0 (No data MDTs are created for this VRF instance.)

Usage Guidelines

See Limiting the Maximum Number of Data MDTs.

Required Privilege Level

routing—To view this statement in the configuration.

routing-control—To add this statement to the configuration.


[Contents] [Prev] [Next] [Index] [Report an Error]