[Contents]
[Prev]
[Next]
[Index]
[Report an Error]
Adding a Sequential Compound Operation
A sequential compound operation is a combination
of simple or compound actions that you want to execute on one or more
devices in a specific order or sequence. From the Saved Operations
dialog box, you can combine simple or compound operations to create
compound operations that run sequentially in real time, or at a scheduled
interval using the Add button and the Edit link. (See Figure 5.)
Figure 5: Sequential Compound Operation

To add a sequential compound
operation, follow these steps:
- From the JUNOScope main window, click Settings > Saved
Operations. The Saved Operations dialog box appears.

- Click Add. The Add Compound Operation
dialog box appears.

- Type a name for the sequential compound operation in the
Name text box.
- Type an optional comment describing the sequential compound
operation in the Comment text box.
- Click the Sequential option button. The Move Up and Move
Down action buttons are enabled.
- Select the operations that you want to be in the sequential
operation from the Available Operations list box, and click Add. The
selected operations appear in the Selected Operations list box.
- Use the Move Up and Move Down action buttons to change
the order in which the operation will occur. These buttons are only
available when you select the Sequential option. The operations will
be executed in the order in which they appear in the list from top
to bottom.
- Click OK.
The compound operation appears alphabetically in
the Saved Operations list box. You can edit compound operations from
the Saved Operations dialog box by clicking the Edit link. The Edit
link is specific only to compound operations.
[Contents]
[Prev]
[Next]
[Index]
[Report an Error]