When you configure channelized IQ interfaces, keep in mind these rules of thumb:
You configure APS and MSP at the controller level only. To configure, include the working-circuit and protect-circuit statements at the [edit interfaces coc12-fpc/pic/port sonet-options aps] or [edit interfaces coc3-fpc/pic/port sonet-options aps] hierarchy level for APS and the [edit interfaces cstm1-fpc/pic/port sonet-options aps] hierarchy level for MSP.
When you enable the controller-level interface as the working circuit, all partitions under the working circuit are also enabled. This is the default behavior even when APS or MSP is not configured. When the backup circuit interface is disabled, all partitions under this protected circuit are also disabled. If the working circuit fails, the interfaces are switched: The working circuit and all its partitions are disabled, and the protect circuit and all its partitions are enabled. You can verify this behavior by entering the show interfaces controller command. The disabled interfaces are shown as “admin down” and the enabled interfaces are shown as “admin up.”
user@router# wildcard delete interfaces ds-0/0/0:0:.*
![]() |
Note: If you configure the q-pic-large-buffer statement and APS in a multirouter topology, the Channelized IQ PIC resets and causes an APS switchover. |