[Contents] [Prev] [Next] [Index] [Report an Error]

Verifying Graceful Routing Engine Switchover Operation

To verify whether graceful Routing Engine switchover is enabled, on the backup Routing Engine, issue the show system switchover command. When the output of the command indicates that the Graceful switchover field is set to on, graceful Routing Engine switchover is operational. The status of the kernel database and configuration database synchronization between Routing Engines is also provided. For example:

Graceful switchover: On
Configuration database: Ready
Kernel database: Ready
Peer state: Steady state

Note: You must issue the show system switchover command on the backup Routing Engine. This command is not supported on the master Routing Engine.

For more information about the show system switchover command, see the JUNOS System Basics and Services Command Reference.


[Contents] [Prev] [Next] [Index] [Report an Error]